Arrian Yulianto

Project Engineer Pertamina Hulu Rokan ǀ Project Management ǀ Analytical & Strategic Thinker ǀ Problem Solver ǀ Good Project Planner & Executor ǀ Mechanical Engineer

  • Report this post

Hello all Linkedin Member,Here I would like to share some terminologies on Project Management. 𝗘𝗻𝗴𝗶𝗻𝗲𝗲𝗿𝗶𝗻𝗴FS = Feasibility StudyFEED = Front End Engineering DesignDED = Detail Engineering DesignTRM = Technical Review MeetingTBE = Technical Bid EvaluationSDRL = Supplier Document Register ListIFR = Issued for ReviewIFA = Issued for ApprovalIFC = Issued for ConstructionAFC = Approved for ConstructionMDR = Manufacture Data RecordITP = Inspection and Test PlanTPI = Third Party InspectorMRIR = Material Receiving Inspection ReportRFI = Request for InspectionPIM = Pre-Inspection MeetingNCR = Non-Conformance ReportIRN = Inspection Release NotesSRN = Shipping Release NotesPL = Packing ListMOM = Minutes of MeetingTQ = Technical QueryFAT = Factory Acceptance TestSAT = Site Acceptance TestBOM = Bill of MaterialsBOQ = Bill of QuantityMTO = Material Take OffMRO = Material Request OrderTOC = Top of ConcreteTOG = Top of GroutingCOG = Center of GravityTOS = Top of SupportBOP = Bottom of Pipe𝗣𝗿𝗼𝗰𝘂𝗿𝗲𝗺𝗲𝗻𝘁PO = Purchase OrderWO = Work OrderRFP = Request for ProposalRFQ = Request for QuotationKOM = Kick Off MeetingDP = Down PaymentCO = Change OrderFOB = Free on BoardFOT = Free on TruckDAP = Delivered At PlaceDDP = Delivered Duty PaidETD = Estimate Time DeliveredETA = Estimate Time ArrivedLT = Lead TimePB = Performance BondWB = Warranty Bond𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻CEP = Construction Execution PlanJSA = Job Safety AnalysisJS = Join SurveyCPM = Critical Path MethodMEP = Mechanical Electrical PlumbingPPE = Personal Protective EquipmentQA = Quality AssuranceQC = Quality ControlWBS = Work Breakdown StructureRBS = Risk Breakdown StructureSOP = Standard Operational ProcedureKindly do not hesitate to add more if you have another list that you know.Happy Learning and Keep Positive Sharing 😀#projectmanagement #projectengineering #procurementmanagement #constructionmanagement

545

13 Comments

Like Comment

Mastura Haron

Project Management | Civil Engineering Tech. (Environment)

1w

  • Report this comment

could also add EI = Engineer InstructionVO = Variation OrderCOC = Certificate of CompletionCOP = Certificate of PaymentCNC = Certificate of Non-Completion

Like Reply

1Reaction

Sigit Rahayu

Document Control

1w

  • Report this comment

To as a Document Controller point 11."MDR = Master Document Register"

Like Reply

1Reaction

Yulan Ibnu Mulkam ST CFSP

Process Safety Consultant

1w

  • Report this comment

IFU = Issued For Use

Like Reply

1Reaction

Maulidin Iqbal Firmansyah

Subsea Engineer di McDermott International Inc.

1w

  • Report this comment

MOCEACEVM

Like Reply

1Reaction

Omar Abdussaid

“That which does not kill us, makes us stronger.” -Nietzsche-"Fainna ma'al 'usri yusra" -QS.94:5-

1w

  • Report this comment

IFI: Issued for InformationMOC : Management of ChangeDO: Delivery OrderDN: Delivery NoteFCR: Field Change RequestASB: As-BuitAML: Approved Manufacture ListVDRL: Vendor Document Register ListRFC: Ready for CommissioningRFSU: Ready for Start-UpPSSR: Pre-Start up Safety ReviewTBT: Toolbox TalkTBM: Toolbox MeetingLOI: Letter of IntentTO: Tender OfferPEP: Project Execution PlanPQP: Project Quality PlanMSDS: Material Safety Data Sheet

Like Reply

2Reactions 3Reactions

Estanislau D.

Mechanical Engineering Professional

1w

  • Report this comment

T.O.S - Top of steel

Like Reply

1Reaction

See more comments

To view or add a comment, sign in

More Relevant Posts

  • SARDAR YASSER

    Operation Manager

    • Report this post

    Project Management terminologiesE𝗻𝗴𝗶𝗻𝗲𝗲𝗿𝗶𝗻𝗴 FS = Feasibility Study FEED = Front End Engineering Design DED = Detail Engineering Design TRM = Technical Review Meeting TBE = Technical Bid Evaluation SDRL = Supplier Document Register List IFR = Issued for Review IFA = Issued for Approval IFC = Issued for Construction AFC = Approved for Construction MDR = Manufacture Data Record ITP = Inspection and Test Plan TPI = Third Party Inspector MRIR = Material Receiving Inspection Report RFI = Request for Inspection PIM = Pre-Inspection Meeting NCR = Non-Conformance Report IRN = Inspection Release Notes SRN = Shipping Release Notes PL = Packing List MOM = Minutes of Meeting TQ = Technical Query FAT = Factory Acceptance Test SAT = Site Acceptance Test BOM = Bill of Materials BOQ = Bill of Quantity MTO = Material Take Off MRO = Material Request Order TOC = Top of Concrete TOG = Top of Grouting COG = Center of Gravity TOS = Top of Support BOP = Bottom of Pipe 𝗣𝗿𝗼𝗰𝘂𝗿𝗲𝗺𝗲𝗻𝘁 PO = Purchase Order WO = Work Order RFP = Request for Proposal RFQ = Request for Quotation KOM = Kick Off Meeting DP = Down Payment CO = Change Order FOB = Free on Board FOT = Free on Truck DAP = Delivered At Place DDP = Delivered Duty Paid ETD = Estimate Time Delivered ETA = Estimate Time Arrived LT = Lead Time PB = Performance Bond WB = Warranty Bond 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻 CEP = Construction Execution Plan JSA = Job Safety Analysis JS = Join Survey CPM = Critical Path Method MEP = Mechanical Electrical Plumbing PPE = Personal Protective Equipment QA = Quality Assurance QC = Quality Control WBS = Work Breakdown Structure RBS = Risk Breakdown Structure SOP = Standard Operational Procedure

    105

    2 Comments

    Like Comment

    To view or add a comment, sign in

  • Ch Manzoor Qadir Chattha

    Senior Surveyor at Saudi Consolidated Engineering co (kahtib&alami)Riyadh

    • Report this post

    Hello all Linkedin Members,Here I would like to share some terminologies on Project Management.√ ENGINEERING - FS = Feasibility StudyFEED = Front End Engineering DesignDED = Detail Engineering DesignTRM = Technical Review MeetingTBE = Technical Bid EvaluationSDRL = Supplier Document Register ListIFR = Issued for ReviewIFA = Issued for ApprovalIFC = Issued for ConstructionAFC = Approved for ConstructionMDR = Manufacture Data RecordITP = Inspection and Test PlanTPI = Third Party InspectorMRIR = Material Receiving Inspection Report EI = Engineering Instructions NOV= Notification Of Variation RFI = Request for InspectionPIM = Pre-Inspection MeetingNCR = Non-Conformance ReportIRN = Inspection Release NotesSRN = Shipping Release NotesPL = Packing ListMOM = Minutes of MeetingTQ = Technical QueryFAT = Factory Acceptance TestSAT = Site Acceptance TestBOM = Bill of MaterialsBOQ = Bill of QuantityMTO = Material Take OffMRO = Material Request OrderTOC = Top of ConcreteTOG = Top of GroutingCOG = Center of GravityTOS = Top of SupportBOP = Bottom of Pipe√ PROCUREMENT -PO = Purchase OrderWO = Work OrderRFP = Request for ProposalRFQ = Request for QuotationKOM = Kick Off MeetingDP = Down PaymentCO = Change OrderFOB = Free on BoardFOT = Free on TruckDAP = Delivered At PlaceDDP = Delivered Duty PaidETD = Estimate Time DeliveredETA = Estimate Time ArrivedLT = Lead TimePB = Performance BondWB = Warranty Bond√ CONSTRUCTION -CEP = Construction Execution PlanJSA = Job Safety AnalysisJSA = Job Safety AnalysisJS = Join SurveyCPM = Critical Path MethodMEP = Mechanical Electrical PlumbingPPE = Personal Protective EquipmentQA = Quality AssuranceQC = Quality ControlWBS = Work Breakdown StructureRBS = Risk Breakdown StructureSOP = Standard Operational ProcedureKindly do not hesitate to add more if you have another list that you know.

    3

    Like Comment

    To view or add a comment, sign in

  • Samoon Sabrinas, Bsc (Hons)in QUANTITY SURVEYOR, UK•1st

    Quantity Surveyor || Cost Manager || Estimator (Civil, MEP & Fit-Out). Commercial & Professional Construction. M(SCE)@Computer Engineering Department Riyadh🇸🇦📞: +966509260985مساح الكميات

    • Report this post

    Hello all Linkedin Members,Here I would like to share some terminologies on Project Management.√ ENGINEERING - FS = Feasibility StudyFEED = Front End Engineering DesignDED = Detail Engineering DesignTRM = Technical Review MeetingTBE = Technical Bid EvaluationSDRL = Supplier Document Register ListIFR = Issued for ReviewIFA = Issued for ApprovalIFC = Issued for ConstructionAFC = Approved for ConstructionMDR = Manufacture Data RecordITP = Inspection and Test PlanTPI = Third Party InspectorMRIR = Material Receiving Inspection Report EI = Engineering Instructions NOV= Notification Of Variation RFI = Request for InspectionPIM = Pre-Inspection MeetingNCR = Non-Conformance ReportIRN = Inspection Release NotesSRN = Shipping Release NotesPL = Packing ListMOM = Minutes of MeetingTQ = Technical QueryFAT = Factory Acceptance TestSAT = Site Acceptance TestBOM = Bill of MaterialsBOQ = Bill of QuantityMTO = Material Take OffMRO = Material Request OrderTOC = Top of ConcreteTOG = Top of GroutingCOG = Center of GravityTOS = Top of SupportBOP = Bottom of Pipe√ PROCUREMENT -PO = Purchase OrderWO = Work OrderRFP = Request for ProposalRFQ = Request for QuotationKOM = Kick Off MeetingDP = Down PaymentCO = Change OrderFOB = Free on BoardFOT = Free on TruckDAP = Delivered At PlaceDDP = Delivered Duty PaidETD = Estimate Time DeliveredETA = Estimate Time ArrivedLT = Lead TimePB = Performance BondWB = Warranty Bond√ CONSTRUCTION -CEP = Construction Execution PlanJSA = Job Safety AnalysisJSA = Job Safety AnalysisJS = Join SurveyCPM = Critical Path MethodMEP = Mechanical Electrical PlumbingPPE = Personal Protective EquipmentQA = Quality AssuranceQC = Quality ControlWBS = Work Breakdown StructureRBS = Risk Breakdown StructureSOP = Standard Operational ProcedureKindly do not hesitate to add more if you have another list that you know.

    6

    1 Comment

    Like Comment

    To view or add a comment, sign in

  • Ar. Akshaj Sharma

    BIM Architect @ Hoxton & Urban | B. Arch Graduate Indo Global College of Architecture

    • Report this post

    Mastering project management terminologies 🚧📋In the fast-paced world of construction and project management, knowing the key terms can make a world of difference. Here's a quick reference guide we use daily:🔍 RFI: Request for Information🛠️ CRFI: Contractor Request for Inspection📦 MIR: Material Inspection Request📜 IFC: Issue for Construction✏️ EI: Engineer Instruction📐 SD: Shop Drawing🏗️ ASBD: As Built Drawing📄 JSI: Job Site Instruction🧪 ITP: Inspection Test Plan📝 PAC: Provisional Acceptance Certificate✅ FAC: Final Acceptance Certificate🔬 ITL: Independent Testing Laboratory💰 CPI: Cost Performance Index📌 SI: Site Instructions❓ TQ: Technical Query🛒 LPO: Local Purchase OrderOther key terms to know:📃 LOI: Letter of Intent✅ TPI: Third Party Inspection📋 MAS: Material Approval Submission💳 L/C: Letter of Credit📅 CDC: Current Date Cheque⏳ PDC: Post Dated Cheque🚧 IP: Inspection Plan🧪 TSR: Test Sample Request🔧 WR: Work Request📦 MIV: Material Issue Voucher📌 SMR: Site Material Requisition⚠️ NCR: Non-Conformance Report📑 P&ID: Piping and Instrumentation Diagram📥 MDN: Material Delivery Note🦺 SR: Safety ReportKnowing these terms ensures seamless communication and efficient project execution. Which of these terms do you use the most? Share your insights below!#architecture #architect #management #innovation #design #sustainability #ProjectManagement #construction #engineering #inspection #SiteWork #ConstructionProject #efficiency

    4

    Like Comment

    To view or add a comment, sign in

  • Muhammad Asif Ghaffar

    Project Engineer @ Zamil Offshore

    • Report this post

    Hello all Linkedin Member,Here I would like to share some terminologies on Project Management. 𝗘𝗻𝗴𝗶𝗻𝗲𝗲𝗿𝗶𝗻𝗴FS = Feasibility StudyFEED = Front End Engineering DesignDED = Detail Engineering DesignTRM = Technical Review MeetingTBE = Technical Bid EvaluationSDRL = Supplier Document Register ListIFR = Issued for ReviewIFA = Issued for ApprovalIFC = Issued for ConstructionAFC = Approved for ConstructionMDR = Manufacture Data RecordITP = Inspection and Test PlanTPI = Third Party InspectorMRIR = Material Receiving Inspection ReportRFI = Request for InspectionPIM = Pre-Inspection MeetingNCR = Non-Conformance ReportIRN = Inspection Release NotesSRN = Shipping Release NotesPL = Packing ListMOM = Minutes of MeetingTQ = Technical QueryFAT = Factory Acceptance TestSAT = Site Acceptance TestBOM = Bill of MaterialsBOQ = Bill of QuantityMTO = Material Take OffMRO = Material Request OrderTOC = Top of ConcreteTOG = Top of GroutingCOG = Center of GravityTOS = Top of SupportBOP = Bottom of Pipe𝗣𝗿𝗼𝗰𝘂𝗿𝗲𝗺𝗲𝗻𝘁PO = Purchase OrderWO = Work OrderRFP = Request for ProposalRFQ = Request for QuotationKOM = Kick Off MeetingDP = Down PaymentCO = Change OrderFOB = Free on BoardFOT = Free on TruckDAP = Delivered At PlaceDDP = Delivered Duty PaidETD = Estimate Time DeliveredETA = Estimate Time ArrivedLT = Lead TimePB = Performance BondWB = Warranty Bond𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻CEP = Construction Execution PlanJSA = Job Safety AnalysisJS = Join SurveyCPM = Critical Path MethodMEP = Mechanical Electrical PlumbingPPE = Personal Protective EquipmentQA = Quality AssuranceQC = Quality ControlWBS = Work Breakdown StructureRBS = Risk Breakdown StructureSOP = Standard Operational ProcedureKindly do not hesitate to add more if you have another list that you know.Happy Learning and Keep Positive Sharing 😀

    109

    4 Comments

    Like Comment

    To view or add a comment, sign in

  • Wael Badr

    MEP Project Manager @ Hassan Allam Holding | B.Sc. Electrical Engineering

    • Report this post

    The most important abbreviations in the construction field.

    1

    Like Comment

    To view or add a comment, sign in

  • Osama Elkhouly

    Senior Document Controller | Expert in Construction Projects Documentation | 8+ Years of Experience Aconex Document Administrator

    • Report this post

    some helpful abbreviations 😍

    1

    Like Comment

    To view or add a comment, sign in

  • Zia Ur Rehman

    Civil Engineer|MSc. Civil Engineering '25 at UMT|BSc. Civil Engineering, CUI Abbottabad Campus.

    • Report this post

    Construction/Project Management terminologies: 1. RFI - Request for Information 2. RFQ - Request for Quotation 3. RFP- Request for Proposal 4. BOQ- Bill of Quantities 5. BBS - Bar Bending Schedule 6. LOD- Level of Detail 7. LOA- Letter of Acceptance 8. LOI- Letter of Intent 9. MIR- Material Inspection Report 10. NCR- Non-Conformance Report 11. CAR- Corrective Action Report 12. SIR- Site Inspection Report 13. ITP- Inspection and Test Plan 14. MS- Method Statement 15. WIR- Work Inspection Request 16. DPR- Daily Progress Report 17. WBS- Work Breakdown Structure 18. P&ID- Piping and Instrumentation Diagram 19. QA/QC- Quality Assurance/Quality Control 20. SWMS- Safe Work Method Statement 21. HSE- Health, Safety, and Environment 22. TQ- Technical Query 23. As-Built- As-Built Drawings 24. GFC- Good for Construction (Drawings) 25. IFC- Issued for Construction (Drawings) 26. CVI- Confirmation of Verbal Instruction 27. SI- Site Instruction 28. EI- Engineer's Instruction 29. FAT- Factory Acceptance Test 30. SAT- Site Acceptance Test 31. MOA- Memorandum of Agreement 32. MOM- Minutes of Meeting 33. CWP- Construction Work Package 34. COP - Certificate of Payment 35. EOT- Extension of Time 36. PCN- Project Change Notice 37. VOR - Variation Order Request 38. COC- Certificate of Completion 39. CCC- Contractor Completion Certificate 40. T&C- Testing and Commissioning 41. FCR - Field Change Request 42. LPO - Local Purchase Order 43. CSR- Construction Schedule Report 44. BAR Chart - Bar Chart Schedule 45. CPM- Critical Path Method 46. DLP - Defects Liability Period 47. PR - Purchase Request 48. PO - Purchase Order 49. FIR - Field Inspection Report 50. PDR - Preliminary Design Review

    18

    1 Comment

    Like Comment

    To view or add a comment, sign in

  • Sakthirajan Kaliyamoorthy

    RTA Approved Safety/Civil Engineer

    • Report this post

    Important Abbreviations

    Like Comment

    To view or add a comment, sign in

  • Er Muhammed Niyas

    Electrical Engineer | MEP Auto CAD | Project Execution |MEP Coordination | Quality Management | Looking for an opportunity to work in MEP Construction. |

    • Report this post

    Project Management Terminologies: RFI = Request for InformationCRFI = Contractor Request for InspectionMIR = Material Inspection RequestIFC = Issue for ConstructionEI = Engineer InstructionSD = Shop DrawingASBD = As Built DrawingJSI = Job Site InstructionITP = Inspection Test PlanPAC = Provisional Acceptance CertificateFAC = Final Acceptance CertificateITL = Independent Testing LaboratoryCpi = Cost Performance IndexSI = SITE INSTRUCTIONSTQ = TECHNICAL QUREYLPO = Local Purchase OrderITP = Inspection Test PlanTPI = Third Party InspectionLOI = Letter of IntentC.O = Confirmation OrderMAS = Material Approval SubmittalL/C = Letter of CreditCDC = Current Date ChequePDC = Post Dated ChequeIP = Inspection PlanTAR = Test Sample RequestWIR = Work Inspection RequestMIV = Material Issue VoucherSMT = Site Material RequisitionFIN = Field Inspection NoticeITP = Inspection and Test PlansP&.ID = Piping and Instrumentation DiagramNCR = Non-Conformance Report.RFI = Request for Information.CL = Check ListTBT = Tool Box TalkIR = Inspection Request.MDN = Material Delivery Note.JSI = Job Site Instructions.SR = Safety Report.SOP = Safety Operating ProceduresMSDS = Material Safety Data Sheet Tr = Transmittal.TCS = Technical Comparison Sheet.CCS = Cost Comparison SheetQA/QC = Quality Assurance / Quality ControlQS=Quantity SurveyorBOQ=Bill Of QuantityLOI=Letter Of IntentPQP=Project Quality PlanITP=Inspection Test PlanHSEP=Health Safety and Environment PlanJV=Join VenturePB=Performance BondTB=Tender BondCAR=Contractor All RiskRFMA = Request for Material ApprovalRFQ = Request for QuotationRFV = Request for VariationVO = Variation OrderSF = Submittal FormTQ = Technical QueryDSR = Daily Site ReportMOM = Minutes of MeetingSWI = Site Work InstructionsPMI = Project Manager InstructionsRAS = Request for Alternatives or SubstitutionMDC = Material Deliveries ChecklistRFI = Request for InspectionNCR = Non Conformance ReportSVN = Safety Violation notice#construction #Engineering

    42

    6 Comments

    Like Comment

    To view or add a comment, sign in

Arrian Yulianto on LinkedIn: #projectmanagement #projectengineering #procurementmanagement… | 13 comments (33)

Arrian Yulianto on LinkedIn: #projectmanagement #projectengineering #procurementmanagement… | 13 comments (34)

10,514 followers

  • 148 Posts
  • 4 Articles

View Profile

Connect

More from this author

  • Develop ADAPTABILITY when the project Falls behind schedule Arrian Yulianto 10mo
  • Key Milestone on EPC Project Execution Arrian Yulianto 1y
  • Instrument Air Compressor and Air Dryer Package (IA/PA) Arrian Yulianto 1y

Explore topics

  • Sales
  • Marketing
  • IT Services
  • Business Administration
  • HR Management
  • Engineering
  • Soft Skills
  • See All
Arrian Yulianto on LinkedIn: #projectmanagement #projectengineering #procurementmanagement… | 13 comments (2025)

References

Top Articles
Latest Posts
Recommended Articles
Article information

Author: Maia Crooks Jr

Last Updated:

Views: 5812

Rating: 4.2 / 5 (43 voted)

Reviews: 90% of readers found this page helpful

Author information

Name: Maia Crooks Jr

Birthday: 1997-09-21

Address: 93119 Joseph Street, Peggyfurt, NC 11582

Phone: +2983088926881

Job: Principal Design Liaison

Hobby: Web surfing, Skiing, role-playing games, Sketching, Polo, Sewing, Genealogy

Introduction: My name is Maia Crooks Jr, I am a homely, joyous, shiny, successful, hilarious, thoughtful, joyous person who loves writing and wants to share my knowledge and understanding with you.